O5/R10 Station
O5 Station
Station Type Underground 3 floors with side platform (transfer the Red and Orange Line)
Station Length 334 meters
The Quantity of Entry& Exit 4
R10 Station
Station Type Underground 3 floors with side platform (transfer the Red and Orange Line)
Station Length 209 meters
The Quantity of Entry& Exit 4